We have been working in these groups since last ten years and giving our services both in External Line Extension work and in consultation part both in for EB connections and with Electrical Safety Dept. And pollution Control Board to avail DG set permission for various sites in M.P. & CG. We have successfully completed the EB extension work in MP & CG state for about 300 sites of telecom companies. We applied for the connections and installed 25/63/100 KVA electrical power sub stations with 33KV/11KV line/ LT line etc and other type work of system earthing etc. Colony electrification & HT Consumer installation also carried out by us. PMGSY line shifting for 100 Kms. Also we are successfully running the work with of India site at Karnataka.
In this group we are providing our consultancy services also. The company is Delivering order of 1000 sites to avail the DG Sets Permission from Electrical Safety Dept. And Pollution Control Board, M.P. with required capacity of KWH meter installation. We have completed approx 3000 nos DG Permissions from Safety Department in MP & CG State so far, for telecommunication companies, Banks, Hotels, insurance companies & reliance power projects.
SL | Name of Employer | Name of Work |
---|---|---|
1 | URC Construction Pvt Ltd. (Bhopal Metro Rail Project) | Design and Construction of Eight (8) Elevated Metro Rail
Stations including Viaduct portion within the stations and Transition
spans on either side of the stations (AIIMS, Alkapuri, Habibganj
Naka, Habibganj, M.P Nagar Zone-1, DB City Mall, Kendriya
Vidyalaya and Subhash Nagar)” for Bhopal Metro Rail Project.”-
|
2 | VK BUILDING SERVICES (Gujarat Metro Rail Corporation Limited) | GMRCL (Gujarat Metro Rail Corporation Limited ) Electrical
work at Ahmedabad.-
|
3 | SHYAM SHREE RESIDENCY PVT. LTD. (west central Railway) | Work Details:- Design/ Modification, supply, erection, testing and commissioning of Ganesh Ganj SP and other necessitate work of 2x25 kV AT feeding OHE system of Indian Railway along with other works in relation with provision of 3rd line in Bina-Katni section over west central Railway |
4 | Jayant Infratech Limited (West Central Railway | Design, Supply, Erection, Testing and Cornmissioning of 2x25 KV 50 Hz, AC Single Phase Over Head equipment and modification to existing OHE between Sant Hirdaram Nagar-shampur station in connection with electrification of RMA-BPL new BG line Project. |
5 | WEST CENTRAL RLY | Balance Electrical work of power supply arrangement to service buildings, El building, Cabling, Overheadlines, platform/FOB/COP wiring/lighting, quarter wiring, service building wirings, modification of Power line, Power line Crossings and other miscellaneous work of General service in Bina-Katni section (phase-III)in connection with Bina-Katni 3rd line project of West Central Railway. |
SL | Name of Employer | Name of Work |
---|---|---|
1 | VITS Total Power Solutions Pvt. Ltd. (IRCON Renewable Power Ltd (IRPL) | “Supply, Erection, Testing and commissioning including civil works of
220kV Double Circuit Transmission Line including Supply of Tower,
Conductor, Insulator, Hardware Fitting, Earth wire, Earth wire
accessories, OPGW accessories, ROW, etc. along with 2 Nos
|
2 | ReNew Power (Ostro Bhesada Wind Private Ltd) | Supply of material for RTC-3, Chandwad & Patoda Project, MH
|
3 | ReNew Power (ReNew Wind Energy (Rajasthan 2) Pvt Ltd) | Erection of material for RTC-3, Chandwad & Patoda Project, MH
|
SL | Name of Employer | Name of Work |
---|---|---|
1 | IRB Westcoast Tollway Pvt. Limited. | Electrical lines shifting work for four laning of nh-66 in karnataka
|
2 | Ashoka Buildcon Limited | Shifting of electrical lines for four laning of Tumakuru to Shivamogga nh-206 road arsikere division
|
3 | Ashoka Buildcon Limited | Construction of eight lane Vadodra kim
Expressway, package iv from KM. 279.000 to KM. 292.000
Under NHDP phase vi on hybrid annuity mode
|
4 | Dilip Buildcon Limited | Shifting of existing EHV 110KV & 220KV & 400KV line
At Bellary to Byrapura section of NH-150A in the state
of Karnataka. Utility shifting of existing work
|
5 | PNC Infratech Limited | Four Laning of Challakere to Hiriyur Section
(Package-iii) of NH-150(a) on Ham Mode Under
Bharatmala Pariyojma in the State of Karnataka
|
6 | Sadbhav Engg Limited | LT/11KV Line Shifting for Two Lanning of Gadag to
Honnali Project State Highway in Haveri & Davangere
District
|
7 | Ravi Infrabuild Projects Pvt. Ltd. | Proposal for UTILITY RELOCATION PLAN of 66 KV & 220KV
EHT lines of GETCO @ km 4+888 TO km 35+000 for PACKAGE- 1
& km 35+000 TO km 67+000 for PACKAGE- 2 at SANCHORE TO
SANTALPUR (BANASKANTHA DISTRICT) of PACKAGE- 3 LOT 4 OF
BHARATMALA ROAD PROJECT.
|
8 | Ravi Infrabuild Projects Pvt. Ltd. | Construction of 6-lane Access Controlled Green Field Highway
From Km 35+000 to Km 67+000 of Rajasthan Gujarat Border to
Santalpur Section of Nh-754k as Part of Amritsar-jamnagar
Economic Corridor in the State of Gujarat on Epc Mode Under
Bharatmala Pariyojana (Phase-1) (Aj/rgbs-package-2).
|
9 | M/s MKC Infrastructure Ltd. | “Construction of Eight Lane access controlled Expressway
from Bani Village to Bardawadi village of Mandsaur district (Ch.
517.420 to 546.920; Design Ch. 65+000 to Ch. 94+500) section
of Delhi – Vadodara Greenfield Alignment (NH-148N) on EPC
Mode under Bharatmala Pariyojana in the State of Madhya
Pradesh.”- Package-19
|
10 | WELSPUN ROAD INFRA PVT LTD | SHIFTING OF ELECTRICAL UTILITIES FOR U RUPGRADATION OF ROADS IN MAHARASHTRA ON HYBRID ANNUITY MODE (HAM), PACKAGE NO AM-2
|
11 | M/s PNC INFRATECH LIMITED | “Supply & Erection and commissioning of PKG-2 Chainage Km
From 26+000 to Km 97+000 MH or KN Border (Badadal) -
Maradgi S Ankola Section of NH-150C.”- Package-II Of Akkalkot-
KNT/TS Border as a part of Surat-Chennai Economic Corridor on
Hybrid Annuity Mode Under Bharatmala Pariyojna
|
11 | M/s PNC INFRATECH LIMITED | “Supply & Erection and commissioning of PKG-2 Chainage Km
From 26+000 to Km 97+000 MH or KN Border (Badadal) -
Maradgi S Ankola Section of NH-150C.”- Package-II Of Akkalkot-
KNT/TS Border as a part of Surat-Chennai Economic Corridor on
Hybrid Annuity Mode Under Bharatmala Pariyojna
|
12 | Ravi Infrabuild Projects Pvt. Ltd. | “Supply, Erection, Testing and commissioning Total 07 Numbers
of Estimates for procurement of Services for erection and
commissioning VIJAYAPURA - SANKESHWAR PROJECT,
Construction of Two lane with paved shoulder from Km.0 to Km.
80 on NH 548B (Vijayapura-Sankeshwar section) in the state of
Karnataka on Hybrid Annuity Mode (HAM).
|
13 | PWD Work Bhopal Government of Madhya Pradesh | Electrical PWD Work in Bhopal Location:
|
14 | Public Health Engineering Department Government of Madhya Pradesh | Design, Construction and Retrofitting of Piped Water Supply
Scheme under Jal Jeevan Mission at Various Villages at different
District of Madhya Pradesh based on Tube wells/Dugwell
including installation of electric submersible/centrifugal water
motor pumps, Construction of RCC OHT, sumpwells, pump
houses, laying and jointing of rising main, distribution pipe line
system, household tap connections, electric power connections.
|